video
Hot Finished ERW Carbon Welded Tubes And Pipes

Hot Finished ERW Carbon Welded Tubes And Pipes

1. Technical standard:ASTM 513 Electric-Resistance-Welded Steel Tubes 2. Steel grade: Q195/Q215/Q235/Q345/E235/E355/ST37/ST52 3. End use: For Machinery, Mechanical Engineer 4. Type: welded pipes,erw steel pipe,erw carbon steel pipe,hot finished welded tubes 5. Surface: Galvanized, oiling, color...

Product Introduction

 

Product Parameters

 

 

Hot Finished ERW Carbon Welded Tubes And Pipes

Material

Material Carbon Steel
Composition Iron and Carbon

 

Specification

Outer Diameter 200mm - 1200mm
Thickness 5mm - 50mm
Length Customizable

 

Key Features

  1. High strength and durability
  2. Excellent weldability
  3. Resistance to corrosion
  4. Dimensional accuracy
  5. Smooth surface finish

  6.  

Chemical Composition

Element Percentage
Carbon (C) 0.25% max
Manganese (Mn) 0.30% - 0.90%
Silicon (Si) 0.10% - 0.35%
Phosphorus (P) 0.040% max
Sulfur (S) 0.050% max

 

Mechanical Properties

Property Value
Tensile Strength 380 MPa min
Yield Strength 230 MPa min
Elongation 25% min
Hardness (Brinell) 120 HB max
Impact Strength 27 Joules min

 

Steel Grade

The steel grade used for hot finished ERW carbon welded tubes and pipes is typically ASTM A53 Grade B or equivalent.

 

Application

Hot finished ERW carbon welded tubes and pipes find application in various industries, including:

  1. Oil and gas transportation
  2. Structural and mechanical engineering
  3. Construction industry
  4. Automobile manufacturing
  5. Water and sewage systems

  6.  

Possible Alternative Grades

When ASTM A53 Grade B is not available or suitable, the following alternative steel grades can be considered:

  1. API 5L Grade B
  2. ASTM A106 Grade B
  3. EN 10217-1 P235TR1
  4. DIN 1629 ST 37.0
  5. JIS G3452 SGP

 

Product Show

hot-finished-erw-carbon-welded-tubes-and30276900174

 

ASTM A312 S30400 304 Welded Stainless Steel Tubes For Industrial Application

 

 

FAQ:

 

Q: Are you trading company or manufacturer?

A: A professional steel pipes materials inventor, manufacturer and solution provider

 

Q: How long is your delivery time?

A: Generally it is 3-5 days if the goods are in stock. or it is 10-15 days if the goods are not in stock, it is according to quantity.

 

Q: Do you provide samples? is it free or extra?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

 

Q: What is your terms of payment?

A: Payment<=2000USD, 100% in advance. Payment>=2000USD, 30% T/T in advance ,70% balance before shipment.

 

If you have another question, pls feel free to contact us

Ms. Lucy Luo

Senior Sales

T:  0086-574-88255925

F:  0086-574-88086983

M: 0086-(0)15355107430

E: sales10@steel-tubes.com torichlimited@gmail.com

Skype: torichsteeltube

www.steel-tubes.com

www.precision-steeltube.com

 

 

 

Hot Tags: hot finished erw carbon welded tubes and pipes, China, suppliers, manufacturers, factory, customized, wholesale, price, OEM, mill, producer, for sale, a672 pipe,

Send Inquiry

whatsapp

teams

E-mail

Inquiry

Bag